Assessing the risk of train delays due to untimely clearing of railway tracks from snow at stations

https://doi.org/10.52170/1815-9265_2024_70_5

Abstract

   The article analyzes technological violations committed due to untimely clearing of snow from railway tracks at stations. Based on statistical data, a graph was constructed depending on the number of violations and their duration. It has been established that in the Novosibirsk region over four winter periods from 2019 to 2023, about 40 % of the total number of stations are weather-sensitive and are at risk of train delays. The maximum number of violations was recorded at Ob station, while their maximum duration was observed at the Inskaya station.

   The main objective of the study is to assess the risk of train delays for reasons related to untimely clearing of snow from railway tracks at stations, by constructing a risk matrix and developing recommendations for its reduction.

   For the railway stations of the Novosibirsk region of the West Siberian Railway, the acceptable level of risk of train delays was 0.104 (train-hour)/year, which is consistent with regulatory documents. It was also determined that the actual level of risks in the region does not exceed the acceptable level. A matrix of risks of train delays due to reasons related to untimely clearing of snow from the railway tracks of stations has been constructed and stations have been identified whose risk level is recommended to be reduced: No. 1, 4, 8, 9, 11, 13, 16 and 20. For each risk level, recommendations have been developed aimed at reducing the frequency of violations and the duration of train delays. It was also possible to determine the boundaries of a broadly acceptable level of risk and railway stations that do not require the development of short-term risk reduction measures in the presence of violations.

About the Authors

A. L. Manakov
Siberian Transport University
Russian Federation

Alexey L. Manakov, Rector

Novosibirsk



A. Yu. Repyakh
Siberian Transport University; Novosibirsk division of the West Siberian Training Center for Professional Qualifications
Russian Federation

Alexey Yu. Repyakh, Postgraduate, teacher

Novosibirsk



References

1. Gapanovich V. A. URRAN system. Universal decision support tool. Railway Transport. 2012;(10):16–22. (In Russ.).

2. Mikava A. V. Ensuring the required static parameters of high-speed and high-speed catenary suspensions at the stages of the life cycle. Specialty 05.22.07 Railway rolling stock, train traction and electrification. Dissertation for the degree of Candidate of Engineering. Mikava Alexander Vanoevich; Ural State Transport University. Ekaterinburg; 2017. 156 p. (In Russ.).

3. Zamyshlyaev A. M., Rachkovsky M. Yu., Nikiforova M. S. Economic criteria for making decisions on the replacement of fixed assets based on the URRAN methodology. Economics of Railways. 2012;(12):11–12. (In Russ.).

4. Repyakh A. Yu. Analysis of the efficiency of snow removal trains using mapping. The Siberian Transport University Bulletin. 2022;(62):15–22. (In Russ.).

5. GOST R 54505–2011. Security is functional. Risk management in railway transport : national standard of the Russian Federation: introduction date 01. 08. 2012. Federal Agency for Technical Regulation and Metrology. Moscow: Standartinform; 2011. 54 p. (In Russ.).

6. Soldatov D. V. Standardization and analysis of reliability indicators of railway automation and telemechanics systems. Specialty 05.22.08 Transportation process management. Dissertation for the degree of Candidate of Engineering. Soldatov Dmitry Vladimirovich; Russian University of Transport. Moscow; 2018. 294 p. (In Russ.).

7. Kovalev A. A., Shayukhov T. Т. Assessment of the risk of failure of a contact network section. Transport Business in Russia. 2015;(5):142–146. (In Russ.).

8. Manakov A. L., Vorobyov V. S., Yanshina I. V., Repina I. B. Human factor in railway technological processes. The Siberian Transport University Bulletin. 2018;(47):5–14. (In Russ.).

9. Methodological recommendations for constructing a risk matrix for Russian Railways. Order No. 3060/r dated 01. 12. 2023. Access from the ConsultantPlus reference and legal system. (In Russ.).

10. Regulations on recording, investigation and analysis of technological violations in the transportation process on the infrastructure of Russian Railways using the automated KASAT system. Order No. 1915/r dated 06. 09. 2021. Access through the ConsultantPlus reference and legal system. (In Russ.).


Review

For citations:


Manakov A.L., Repyakh A.Yu. Assessing the risk of train delays due to untimely clearing of railway tracks from snow at stations. Bulletin of Siberian State University of Transport. 2024;(3):5-11. (In Russ.) https://doi.org/10.52170/1815-9265_2024_70_5

Views: 31


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1815-9265 (Print)