Determination of the processing capacity of loading sites equipped with car dumpers for operation in winter conditions
https://doi.org/10.52170/1815-9265_2023_64_35
Abstract
The article considers the issue of choosing the parameters of coal unloading sites equipped with car dumpers in winter conditions. These conditions are limiting when calculating the processing capacity, because in the technological process of unloading, additional operations are added to warm up the wagons, contributing to the separation of cargo from the wagon body and its defrosting.
The parameters of processing capacity in winter are lower than in summer, so this period of time is included in the calculations of processing capacity as the main one. This makes it possible to ensure a given processing of the car traffic in winter and to set the parameters of the infrastructure of an industrial enterprise for making design decisions and conditions for the interaction of mainline and industrial transport. The adopted design solutions for winter time are redundant for summer time and carry an additional burden in the form of capital costs and operating costs for industrial enterprises engaged in coal unloading.
Reducing the gap in the values of processing capacity between summer and winter time when using car dumpers makes it possible to use loading sites more efficiently, reduce the duration of the company's track development and increase the reliability of the interaction of railway stations of the common network of railways and industrial enterprises.
The article provides examples of several GRES and CHP plants processing capacity, as well as calculations and dependences of the wagons heating places capacity, taking into account the size of the wagons supply for unloading to the car dumper. Combinations of the heating devices capacity, the size of a group of wagons supply and the processing capacity are proposed in tabular form, which should be taken into account when designing places for loading frozen goods.
About the Authors
P. S. BurdyakRussian Federation
Pavel S. Burdyak – Associate Professor of the Railway Stations and Junctions Department, Candidate of Engineering
Novosibirsk
A. D. Kalidova
Russian Federation
Alexsandra D. Kalidova – Associate Professor of the Railway Stations and Junctions Department, Candidate of Engineering
Novosibirsk
References
1. Collection of railway transport transportation rules and tariffs of the USSR. Moscow: Transport; 1985. 56 p. (In Russ.).
2. INFRASIB: a device for defrosting frozen coal in railway wagons. SibORGRES: [site]. (In Russ.). URL: http://www.siborgres-oao.ru/0895654649.
3. SP 37.13330.2012. Set of rules. Industrial transport: updated version of SNiP 2.05.07-91*: approved by order of the Ministry of Regional Development of the Russian Federation dated December 29, 2011 No. 635/7: introduction date 2013-01-01. Moscow; 2012. 281 p. (In Russ.).
4. Boldyrev A. P., Keglin B. G., Ivanov A. V. Development and research of the friction-polymer absorbing apparatus PMKP-110 class t1. Bulletin of the All-Russian Research Institute of Railway Transport. 2005;(4):8. (In Russ.).
5. Boldyrev A. P., Belousov A. G. Computational and experimental evaluation of the functional parameters of the design of the PMKP-110 absorbing apparatus with a polymer retaining block. Dynamics, strength and reliability of transport vehicles. Bryansk State Technical University. Bryansk; 2003. P. 15–28. (In Russ.).
6. Manual for the calculation of the main technical and economic parameters of new means and complexes for the prevention of freezing, the formation of flow ability and unloading of frozen goods transported in railway wagons stations put into effect on 03/01/1979 by order No. 324 of 09/30/1978 on Promtransniiproekt. Moscow; 1979. Issue 4482. (In Russ.). URL: https://files.stroyinf.ru/Data2/1/4293723/4293723175.files/1.gif.
7. Norms of time for shunting work performed at railway stations Russian Railways, standards for the number of crews and shunting locomotives. Russian Railways. Moscow; 2006. 80 p. (In Russ.).
8. Alexandrov M. P. Lifting and transport machines: a textbook for engineering specialties of universities. Sixth edition, reprinted. Moscow: Higher School; 1985. 520 p. (In Russ.).
9. Time standards for loading and unloading operations performed on railway, water and road transport. Part 1. Loading and unloading operations performed at railway stations, enterprises, organizations, institutions of the national economy. Central Bureau of Labour Standards at the Research Institute of Labour of the USSR State Committee for Labour and Social Issues. Moscow: Economics; 1987. (In Russ.).
10. Instructions for calculating the available capacity of railways: instruction of Russian Railways dated November 10, 2010 No. 128. Moscow; 2011. 289 p. (In Russ.).
Review
For citations:
Burdyak P.S., Kalidova A.D. Determination of the processing capacity of loading sites equipped with car dumpers for operation in winter conditions. Bulletin of Siberian State University of Transport. 2023;(1):35-43. (In Russ.) https://doi.org/10.52170/1815-9265_2023_64_35