Preview

Bulletin of Siberian State University of Transport

Advanced search

Proposals for improving the efficiency of railway track overhaul due to innovative equipment

https://doi.org/10.52170/1815-9265_2022_61_33

Abstract

The article presents a brief overview of the railway track technologies development for the railway track overhaul from 1930 to 2021. The analysis of the number of railway track repairs carried out in the “window” mode and "closed stage mode" is given. The comparison of the volumes of track overhaul repairs, as well as the technologies used in 1968 and 2021, in terms of the productivity of the full range of works, is made. The data obtained during the overhaul of the railway track in 2021 on the West Siberian Railway in terms of the actual production of railway construction machines are presented. The weaknesses of the existing technology in terms of the development of leading machines and uneven loading of personnel on working days are determined. To optimize the time of work and eliminate the uneven needs of the personnel involved in the overhaul of the railway track, it is necessary to revise the technology of work production and create innovative railway construction machines that will increase the productivity of the full range of work on the repair sites. The article presents the results of the proposal development for the modernization of existing equipment, in order to increase the productivity of the full range of work and uniform loading of personnel. Due to the use of innovative equipment during the overhaul of the railway track, both the time of work and the volume of manual labor is reduced.

The article also provides recommendations on the organization of major repairs of the railway track with maximum output at the repair sites in the closed stage mode, taking into account the analysis of the actual operation of each track machine. Increasing productivity during the work on laying the railway track, cutting out contaminated ballast and replacing inventory rails with long-length rail lashes will increase the productivity of the full range of works up to 3000 meters of track per day.

About the Authors

A. S. Pikalov
Center for Infrastructure Technologies of STM
Russian Federation

Alexandr S. Pikalov, Director of the Center for Infrastructure Technologies of STM, Candidate of Engineering

Moscow



V. K. Miloradovich
Center for Infrastructure Technologies of STM
Russian Federation

Vladimir K. Miloradovich, Chief Specialist

Moscow



A. A. Sevostyanov
Siberian Transport University
Russian Federation

Alexandr A. Sevostyanov, Lecturer of the Track and Track Facilities Department

Novosibirsk



References

1. Pashin S. A. The glorious anniversary of track machine stations. (In Russ.). URL: http://zeldortransjornal.narod.ru/publik/history/2006/aprel-04-06.htm.

2. Karpushchenko N. I., Pikalov A. S., Trukhanov P. S. Assessment of reliability of technological processes of railway track reconstruction based on data on track machine failures. The Siberian Transport University Bulletin. 2019;(49):5–11. (In Russ.).

3. Ermakov V. M., Manoilo D. S. Technical requirements for track machines for the implementation of digital track repair technology. Railway transport. 2019;(9):30–33. (In Russ.).

4. Pikalov A. S., Velichko D. V., Sevostyanov A. A. The use of the ICON LEICA GEOSYSTEMS 3D Leveling system during the planning of the main site of the roadbed. Scientific problems of transport in Siberia and the Far East. 2017;(1-2):37–40. (In Russ.).

5. Pevsner V. O. The system of determining the need for travel work requires adjustments. Bulletin of VNIIZHT. 2012;(3):8–11. (In Russ.).

6. Pevsner V. O., Grin E. N. Improvement of the track maintenance management system. Railway track. 2021;(2):54–59. (In Russ.).

7. Pevsner V. O., Chechelnitsky A. I., Lisitsyn A. I., Grin E. N., Petropavlovskауа I. B., Baronaite R. A. Determination of the need for travel work in modern conditions. Path and travel economy. 2021;(1):14–20. (In Russ.).

8. Pikalov A. S., Klementov A. S., Kulikov O. N. Actual issues of rational placement, specialization and capacity of production bases of the repair and track complex of JSC “Russian Railways” in modern conditions. Science and business: Ways of development. 2020;(103):50–54. (In Russ.).

9. Pikalov A. S., Klementov A. S., Sevostyanov A. A., Kulikov O. N. The complex process of repairing the links of the track grid. The Siberian Transport University Bulletin. 2021;(56):5–11. (In Russ.).

10. Ryabinin I. A., Kireev Yu. N. Reliability of electric power systems and ship electrical equipment. L.: Shipbuilding; 1974. 141 p. (In Russ.).


Review

For citations:


Pikalov A.S., Miloradovich V.K., Sevostyanov A.A. Proposals for improving the efficiency of railway track overhaul due to innovative equipment. Bulletin of Siberian State University of Transport. 2022;(2):33-43. (In Russ.) https://doi.org/10.52170/1815-9265_2022_61_33

Views: 5


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1815-9265 (Print)